ITC Tower Downtown
Concrete crane base demolition on the 9th floor.

Project Gallery

Check out this recent project at the iconic ITC Tower Downtown. Our task? A daring crane base demolition located on the 9th floor, measuring approximately 20 feet by 40 feet and boasting a formidable 5-foot thickness brimming with rebar.

Despite the challenge posed by the massive concrete structure, our skilled team employed strategic methods and cutting-edge equipment to execute the demolition with precision and efficiency. The aftermath? A mountain of rubble waiting to be cleared.

But that’s not where the adventure ends. We manually wheeled out the rubble using trusty wheelbarrows and the reliable service elevator.

We’re excited as always to continue to push boundaries and redefine excellence in demolition projects of all kinds!

Call Toll Free

(604) 690-0100

Contact Us Now