Location: San Diego, CA (Margerum Avenue)
Project Scope: Residential Site Clearing
Duration: 1 Day
Even in the beautiful neighborhoods of San Diego, hidden boulders can quickly derail a landscaping or construction project. On Margerum Avenue, the team was faced with several large boulders that were preventing progress on a local site. Rock Busters was called in to provide a fast, vibration-free solution to get the project back on track.
The Challenge
The boulders were located in a residential area where heavy blasting or prolonged jackhammering would have been a significant disturbance to the neighbors. The client needed the rock gone quickly and quietly to allow the next phase of construction to begin.
The Solution: One Day, Two Men, Zero Problems
We deployed a 2-person specialist crew equipped with our signature rock-drilling and pneumatic splitting technology.
High-Speed Drilling: Our team quickly mapped out the fracture lines and drilled the boulders to prepare for splitting.
Pneumatic Splitting: Using our high-pressure pneumatic splitters, we broke down the massive stones into easily removable fragments.
Rapid Completion: By working in a coordinated 2-man team, we were able to clear all obstructions in a single day, leaving the site ready for the next crew the very next morning.