Breaking Boulders for the New Childcare Space in Burnaby
Service: Boulders splitting Equipment: Drills, Rock DemonLocation: Frances St, Burnaby, BC Crew: 2-4 workers. Duration: 1 month. Project Background The project initially anticipated a few days of work focused on limited excavation and site preparation. However, during excavation, the team encountered a significantly larger volume of boulders than expected, requiring extensive splitting and hauling. These […]

Project Gallery

Service: Boulders splitting

Equipment: Drills, Rock Demon
Location: Frances St, Burnaby, BC

Crew: 2-4 workers.

Duration: 1 month.

Project Background

The project initially anticipated a few days of work focused on limited excavation and site preparation. However, during excavation, the team encountered a significantly larger volume of boulders than expected, requiring extensive splitting and hauling. These boulders varied in composition, ranging from hard to soft materials, and their continuous emergence from the ground presented an unpredictable challenge. Through effective collaboration with the excavation company, the project was successfully completed, overcoming the complexities of the boulder removal process.

Key Challenges

  1. Unexpected Volume of Boulders: The initial scope underestimated the quantity of boulders, extending the project timeline beyond the planned few days.
  2. Variable Boulder Composition: Boulders ranged from hard (e.g., granite) to softer materials (e.g., sandstone), requiring adaptive splitting techniques and equipment.
  3. Unpredictable Excavation: The continuous discovery of boulders during excavation made it difficult to predict the project’s scope and completion timeline.
  4. Logistical Challenges: Splitting boulders into 2-3 foot pieces and hauling them away required careful coordination to maintain efficiency and site organization.

Collaboration

The project’s success was driven by strong collaboration with the excavation company. Key aspects included:

  • Open Communication: Regular updates and joint problem-solving sessions allowed both teams to address challenges, such as the unpredictable boulder volume and material variability.
  • Resource Sharing: The excavation company provided critical support with heavy machinery, while our team contributed specialized splitting equipment and skilled operators.
  • Flexibility: Both parties adapted to the evolving scope, reallocating resources and adjusting schedules to maintain progress without compromising safety or quality.

Outcomes

  • Successful Boulder Removal: All boulders were split into 2-3 foot pieces and hauled away as required, meeting project specifications for transport.
  • Timely Completion: Despite the expanded scope, the project was completed efficiently through collaborative efforts and adaptive planning.
  • Clean and Safe Site: The work site was maintained in an organized state throughout the project and restored to the client’s satisfaction upon completion.
  • Client Satisfaction: The successful management of the unexpected challenges resulted in a positive outcome, with all deliverables met and the site prepared for the next phase of development.